PCE’s hybriDfMA Living system was used throughout the concept stage allowing the architectural design to be developed around a standard ‘kit of parts’ that were then interchangeable and reconfigurable to create multiple layout iterations. Construction was completed using PCE Ltd’s hybriDfMA hyTower® system.
This approach maximised efficiency in each of the hybriDfMA stages and produced an extremely cost-effective solution along with all the other benefits an offsite system brings to a complex inner-city project, such as significant reductions in onsite man hours, vehicle movements, noise, dust, general disruption and most importantly programme.
Rohan Evans, Sir Robert McAlpine’s Project Director for the Salford Chapel Wharf project:
''PCE are a team that are proactive in their approach to safety and that everyone goes home safely. Not only this, but their maturity and commitment shone through by showing great leadership when participating on the Project Safety Leadership Team.''