PCE Ltd

PCE Ltd is a market leader in the design and build of offsite Hybrid engineered structures based on the principles of design for manufacture and assembly, DfMA.


The PCE HybriDfma process  – construction from a kit of parts

Based on the Royal Holloway College project.

PCE Ltd is…

The PCE HybriDfma approach combining principally structural precast concrete, insitu concrete and steelwork to deliver modern structures, including the buildings external facades as required, is based on extensive experience within many construction sectors including commercial, residential, industrial, custodial, health care, schools and infrastructure.

PCE’s rationalised design solution approach for the various elements of any structure and their connections providing a “kit of parts” philosophy reduces the design process time without compromising on architectural expression, maintains high quality control with ease of manufacture and assists in providing a low waste, fast programme and cost efficient approach.

The latest electronic business systems, many purposely modified and developed by PCE, enhance project control and delivering certainty.

Contact PCE by telephone on 01827 301020 or by email »

PCE Ltd on site Health and Safety focus

Health and safety

An exemplary Health and Safety record and innovator of award winning site safety solutions. PCE continues to receive numerous awards from its clients for its focussed Health and Safety approach.

PCE places great emphasis on training, developing and encouraging career progression

We work to make a difference

PCE places great emphasis on training, developing and encouraging career progression, thus maintaining a highly skilled and motivated staff throughout the company. A company proud of its employees.

Latest offsite hybrid construction news from PCE

  • The architectural colonnade structure at Kingston University Town House
  • PCE worked to develop an offsite fabricated hybrid solution for the concrete frame
  • The use of offsite manufacture leads to an enhanced quality of the completed building
  • Construction of the hybrid structural frame using two tower cranes
  • The use of offsite manufacture leads to a faster on site build
  • Precast concrete units are accurately detailed to achieve the desired minimisation of joint details

Kingston University update 12 – external escape stair assembly

August 13th, 2018|Comments Off on Kingston University update 12 – external escape stair assembly

... and how temporary propping collars are being successfully utilised Rapid progress is being made with the  architectural colonnade structure on the site of the [...]

  • PCE complete offsite manufactured hybrid solution within the contract period
  • PCE delivered certainty for client GMI Construction in Manchester
  • The whole PCE team involved with the project have been outstanding from start to finish
  • PCE Ltd has now completed the construction of the offsite engineered Hybrid frame
  • Brick faced sandwich panel façade for the new Five Star Dakota Boutique Hotel
  • PCE used their HybriDfma approach
  • The construction team has completed the offsite engineered Hybrid frame

Dakota Hotel 12 – Hybrid frame construction complete

August 6th, 2018|Comments Off on Dakota Hotel 12 – Hybrid frame construction complete

Hotel superstructure design and build in Manchester PCE Ltd has completed the offsite manufactured Hybrid solution within the contract period, delivering certainty for client [...]

  • The PCE team racing for the Simon's Heroes charity

Simon’s Heroes Abbott Trail Race – successful outcome for PCE team

August 6th, 2018|Comments Off on Simon’s Heroes Abbott Trail Race – successful outcome for PCE team

The team managed to raise a grand total of £575 for PCE’s charity partner Simon’s Heroes Team PCE Runners all successfully completed the recent [...]

  • Offsite engineered precast sandwich panels being installed at Manchester Hotel
  • Sandwich panels being installed by PCE at Dakota Hotel Manchester
  • The Manchester Dakota Hotel development forms part of the Evans Property Group strategic plan

Dakota Hotel 11 – the first sandwich panels for the final level

July 17th, 2018|Comments Off on Dakota Hotel 11 – the first sandwich panels for the final level

Manchester hotel project is nearing completion The first sandwich panels for the final level were recently installed at the nine storey five star deluxe hotel [...]