Safety
In total over 23,000 hours of accident-free working on site by only 18 multi-skilled site operatives proved the safety systems priority incorporated by PCE during design, manufacture, and construction stages.
Quality
High visual architectural finish requirements achieved. A national Quality Audit carried out by Willmot Dixon including inspection of the manufacturing and construction quality systems used by PCE resulted in achievement of a score of 98.3%.
Speed
Just 13 months from initiating design required to achieve structural completion, including the offsite manufacture of over 1,400 precast concrete and structural steel components and their on-site assembly. This achieved despite the Covid pandemic.
Value
The PCE team ensured the University of Warwick’s target of 50% of project value being constructed from premanufactured offsite components was met, including reducing on-site waste and vehicle delivery movements whilst increasing efficiency. Best Use of Concrete Award winner Offsite Awards 2021.