Integrated façade and M&E systems delivered in conjunction with the construction of the superstructure reducing the overall programme by 30%.
Factory engineered ‘kit of parts’ coupled with extensive offsite preassembly delivered the highest levels of ‘as-built’ quality and predictability.
Integrated façade and M&E systems delivered in conjunction with the construction of the superstructure reducing the overall programme by 30%.
Over 200,000 site man hours and up to 32 storeys delivered safely.
Factory engineered ‘kit of parts’ coupled with extensive offsite preassembly delivered the highest levels of ‘as-built’ quality and predictability.
625m² residential floor plate constructed every 6 days and 4,750 no. Structural and 560 volumetric prefabricated modular M&E components installed in just 12 months.
Integrated façade and M&E systems delivered in conjunction with the construction of the superstructure reducing the overall programme by 30%.