The integrated structural modular façade and windows delivered removed the need for external scaffolding.
Regal London’s Operation Director, Luis Menezes:
‘’The collaborative and transparent relationship with PCE during tender & design development was second to none; all followed by a delivery on site that surpassed our best expectations. Ahead of time, on budget and an excellent product. A rarity in the construction environment!”