A significant use was made of offsite engineered precast units, including fifty PreFastCore modules – weighing up to 50 tonnes each – which formed the lift and stair shafts.
The home of the Royal Holloway University of London Department of Electronic Engineering.
A significant use was made of offsite engineered precast units, including fifty PreFastCore modules – weighing up to 50 tonnes each – which formed the lift and stair shafts.
High quality finish to exposed concrete surfaces.
Constructed in 21 weeks with a 13-personnel site team and reduction in deliveries giving carbon footprint savings.
The tight site location required PCE to be flexible with their build strategy, using a three-phase programme to maximise construction efficiency.