Electronic Engineering Building, Royal Holloway, University of London

The home of the Royal Holloway University of London Department of Electronic Engineering.

Consulting Engineers

Arup

Architect

Stride Treglown

Main Contractor

Osborne

Client

Royal Holloway, University of London

A significant use was made of offsite engineered precast units, including fifty PreFastCore modules – weighing up to 50 tonnes each – which formed the lift and stair shafts.

Safety

Quality

High quality finish to exposed concrete surfaces.
 

Speed

Constructed in 21 weeks with a 13-personnel site team and reduction in deliveries giving carbon footprint savings. 

Value

The tight site location required PCE to be flexible with their build strategy, using a three-phase programme to maximise construction efficiency.
 

PCE System Used

Hybrid Frames

Systemised DfMA delivery of hybrid structural frames and façades

Know More

Related System Projects

Assembly Building B

View More Projects

Let's Talk...

If you would like to discuss a project please contact our team to discuss your requirements...

What's New?

Road to...

View Article

Offsite Efficiencies - Manufacturing Brent Cross Plot...

View Article

Silvertown Plot 6 - DfMA Innovation Making Construction...

View Article
Let's Talk