Current Projects

Assembly Building C

Design, Manufacture, Assemble…. Repeat

Consulting Engineers

Arup

Architect

AHMM

Main Contractor

Galliford Try Construction

Client

Bell Hammer

PCE Ltd was pleased to have been awarded a contract by Galliford Try to design, manufacture, and construct a HybriDfMA office building frame using Offsite manufactured structural steel and precast concrete components together with insitu reinforced concrete.

Building C of the central Bristol Assembly development is a 14-storey tower adjacent to the River Avon for property developer Bell Hammer working with insurer, AXA. The architect is AHMM, with consulting engineers ARUP.

The HybriDfMA framed building will provide 92,000 sq.ft. of office space utilising PCE’s experience of Modern Methods of Construction (MMC), Offsite engineering and providing as much Offsite construction as possible in a very busy city centre location.

PCE System Used

Hybrid Frames

Systemised DfMA delivery of hybrid structural frames and façades

Know More

Related System Projects

Assembly Building B

View More Projects

Let's Talk...

If you would like to discuss a project please contact our team to discuss your requirements...

What's New?

PCE Shortlisted for Tall Buildings Awards...

View Article

HybriDfMA Frame – PCE chosen for Brent Cross Town Plot...

View Article

PCE’s HybriDfMA Frame chosen for Silvertown Plot...

View Article
Let's Talk