With progress on the main programme often dependent on the early completing of lift shaft works, PCE Ltd ensured that all design, planning and manufacturing took place in ample time for construction to commence on site.
PCE’s complete package embraced design, supply, erection and grouting crews and, where required, craneage.
The system uses factory-engineered precast lift boxes, which are delivered to site on a just-in-time basis and erected directly from the delivery vehicle to quickly complete lift towers often in excess of 20 metres in height.
Prior to site works, each unit is carefully designed with any feature required by the client or the lift installers planned and built-in from the outset, ensuring an easier task for follow-on trades once the shafts are installed.
The modular system and close tolerances achieved using precast concrete systems eliminates the problems that can occur when using traditionalshaft construction methods such as blockwork, brickwork, in-situ or steel reinforced concrete, which rely heavily on the skills of site labour, require high levels of supervision and are time consuming.
With progress on the main programme often dependent on the early completing of lift shaft works, PCE ensures that all design, planning and manufacturing takes place in ample time for construction to commence on site. PCE’s complete package embraces design, supply, erection and grouting crews and, where required, craneage.