October 2022 saw the grand reopening of the iconic Battersea Power Station, a once steadfast supplier of London’s electricity and now an energized hub of entertainment, one that PCE is very proud to have helped transform.
October 2022 saw the grand reopening of the iconic Battersea Power Station, a once steadfast supplier of London’s electricity and now an energized hub of entertainment, one that PCE is very proud to have helped transform.
All edge protection was pre-fitted to the flooring units to ensure the when the units were delivered to the site, they could be hoisted directly from the trailer into position.
The identification and use of optimal material meant floor units could be manufactured to a thinner design, without sacrificing structural integrity.
Steel columns were pre-located onto the flooring units prior to onsite lifting, facilitating faster construction in addition to a refined lifting schedule, reducing the number of lifts and resource waste.
PCE’s structural design team used advanced Business Information Modelling to work alongside Mace in creating value engineering benefits, improving the overall delivery of the programme.