With progress on the main programme often dependent on the early completing of lift shaft works, PCE Ltd ensured that all design, planning and manufacturing took place in ample time for construction to commence on site.

PCE’s complete package embraced design, supply, erection and grouting crews and, where required, craneage.

The system uses factory-engineered precast lift boxes, which are delivered to site on a just-in-time basis and erected directly from the delivery vehicle to quickly complete lift towers often in excess of 20 metres  in height.

Prior to site works, each unit is carefully designed with any feature required by the client or the lift installers planned and built-in from the outset, ensuring an easier task for follow-on trades once the shafts  are installed.

The modular system and close tolerances achieved using precast concrete systems eliminates the problems that can occur when using traditionalshaft construction methods such as blockwork, brickwork, in-situ or steel reinforced concrete, which rely heavily on the skills of site labour, require high levels of supervision and are time consuming.

With progress on the main programme often dependent on the early completing of lift shaft works, PCE ensures that all design, planning and manufacturing takes place in ample time for construction to commence on site. PCE’s complete package embraces design, supply, erection and grouting crews and, where required, craneage.

Safety

By pre-planning each installation in fine detail, PCE has perfected a formula for safely and rapidly erecting single or multiple shafts from start to finish in as little as five hours.

Quality

Offsite factory production of lift shaft boxes ensure internal dimensional accuracy maintained with tight tolerance requirements.

Speed

All 5 lift shafts constructed to full height within 5 working days by one erection crew.
Constructing the liftshafts using individual wall panels would have significantly increased onsite programme and costs.
 

Value

3 number 5 storey and 2 number 4 storey lift shafts constructed using only 48 precast components including lift shaft bases and top covers.

Let's Talk...

If you would like to discuss a project please contact our team to discuss your requirements...

What's New?

PCE Shortlisted for Tall Buildings Awards...

View Article

HybriDfMA Frame – PCE chosen for Brent Cross Town Plot...

View Article

PCE’s HybriDfMA Frame chosen for Silvertown Plot...

View Article
Let's Talk