Erection of the hybrid structural frame has now commenced on site by PCE Ltd at Wrexham following their in-house design which led to a variety of structural precast components being utilised including columns, precast walls, stairs and landings and precast hollowcore flooring spanning in excess of eleven metres.
A total of fourteen PreFastCore precast concrete lift and stair boxes weighing up to 15 tonnes each will also being utilised within the building.
PreFastCore, available from PCE, is the ideal system for constructing structural lift, stair and combined lift and stair cores, using offsite engineered precast concrete modular units, providing rapid and safe on site erection to full height.