Offsite technology is changing the contemporary built environment - driving forward projects that represent outstanding examples of prefabrication and factory-based methods, products, systems and disciplines.
Construction of the stunning six storey building was completed using PCE's HybriDfMA bespoke system, which enabled the project to become an environmentally friendly mixed-use teaching building, taking the form of a series of interlocking open-plan volumes enveloped by a facade of colonnades with extensive exposed internal and external concrete finishes.