Vulcan Mill, Manchester updates
PCE Ltd has been appointed by Manchester based Russells Construction Ltd to provide the Design, Manufacture and Construction of an offsite engineered Hybrid Structure for The Loom, a residential development forming part of the £17m final phase of the Vulcan Mill redevelopment, located on Malta Street Manchester.
How PCE HybriDfMA works: a combination of precast and insitu concrete, with structural steelwork
Offsite Magazine provides update on PCE's Vulcan Mill project in Manchester A recent issue of Offsite Magazine, available to read online, has showcased on page 66 both the methodology and the advantages of PCE Ltd's ...read more »
Vulcan Mill update 4 – level 5 flooring units complete
Overcoming tight site constraints PCE has completed construction of level five hollowcore flooring at the Vulcan Mill residential development in Manchester for Russells Construction and have recently started to install the external walls that form ...read more »
Vulcan Mill update 3 – construction of basement and under-croft parking complete
Residential development project update PCE has successfully completed construction of the basement, under-croft parking and amenity areas for a 101-apartment residential development at Vulcan Mill in central Manchester for main contractor Russells Construction. This part ...read more »
Vulcan Mill update 2 – stair cores, basement columns and Deltabeams
Basement level construction gets underway in Manchester PCE Ltd has begun work on the Hybrid structure which will form the basement of the final phase of the Vulcan Mill residential development in Manchester. It consists of ...read more »
Vulcan Mill project to begin shortly in Manchester
HybriDfma structural solution approach for residential development PCE Ltd has been appointed by Manchester based Russells Construction Ltd to provide the Design, Manufacture and Construction of an offsite engineered Hybrid Structure for The Loom, a ...read more »