PCE Ltd is currently onsite at the University of Lincoln, erecting three blocks of student accommodation for F P McCann Ltd under a construction only contract.

  • An anticipated onsite duration of less than 6 months
  • Student accommodation construction in Lincoln
  • 11 storey high precast student accommodation
  • Bowmer and Kirkland who are Main Contractor this construction project

Offsite techniques enable construction when space is at a premium

January 13th, 2017|Comments Off on Offsite techniques enable construction when space is at a premium

Three blocks of precast student accommodation The site of the most recent student accommodation project in Lincoln would present a real challenge with more "traditional" construction methods. The site is a particularly tight one, being [...]

  • Construction contract for FP McCann
  • Onsite time of less than 6 months
  • PCE Ltd is currently onsite at Lincoln University
  • PCE will be erecting the offsite manufactured precast concrete components
  • Precast concrete crosswall construction solution by Bowmer and Kirkland

Precast concrete construction at University of Lincoln

December 12th, 2016|Comments Off on Precast concrete construction at University of Lincoln

Three blocks of precast student accommodation PCE Ltd is currently onsite at the University of Lincoln, working with F P McCann Ltd on a construction only contract. F P McCann were awarded the design and build project [...]