Emirates Old Trafford update 9 – Hilton Garden Inn takes shape
The hotel has two structural precast cores The design and detailing of the offsite engineered structure was carried [...]
The hotel has two structural precast cores The design and detailing of the offsite engineered structure was carried [...]