Royal Holloway University of London updates

PCE Ltd provided a Hybrid Structure for the new building which is the home of the Royal Holloway, University of London Department of Electronic Engineering.

  • PCEs structural steelwork at Royal Holloway University
  • Precast concrete, structural steelwork and insitu concrete
  • Precast concrete components and structural steel by PCE
  • New Department of Electronic Engineering being build by PCE Ltd
  • Royal Holloway University auditorium area under construction by PCE Ltd

Royal Holloway update 3 – precast and insitu concrete with structural steelwork

September 21st, 2017|Comments Off on Royal Holloway update 3 – precast and insitu concrete with structural steelwork

Collaboration is the key for successful project outcome The Hybrid construction approach adopted by PCE Ltd is very much in evidence during the latest construction phases the future home of the Royal Holloway University of London ...read more »

  • Royal Holloway University of London construction underway
  • PCEs Hybrid construction project for the Royal Holloway
  • Royal Holloway University of London Department of Electronic Engineering

Royal Holloway University of London underway

May 16th, 2017|Comments Off on Royal Holloway University of London underway

Hybrid structural solution project commences PCE Ltd has commenced the construction of a Hybrid Structure for the new building to be the home of the Royal Holloway University of London Department of Electronic Engineering. Once ...read more »

PCE areas of interest

Recent PCE activity