Royal Holloway University of London updates
PCE Ltd provided a Hybrid Structure for the new building which is the home of the Royal Holloway, University of London Department of Electronic Engineering.
Royal Holloway update 3 – precast and insitu concrete with structural steelwork
Collaboration is the key for successful project outcome The Hybrid construction approach adopted by PCE Ltd is very much in evidence during the latest construction phases the future home of the Royal Holloway University of London [...]
Royal Holloway update 2 – the advantages of Hybrid Construction in a confined space
Carbon footprint for construction is minimised PCE Ltd is now beginning to erect the steel frame elements of the Hybrid Structure that will become the home of the Royal Holloway University of London Department of [...]
Royal Holloway University of London underway
Hybrid structural solution project commences PCE Ltd has commenced the construction of a Hybrid Structure for the new building to be the home of the Royal Holloway University of London Department of Electronic Engineering. Once [...]