Assembly Building C

Design, Manufacture, Assemble…. Repeat

Consulting Engineers

Arup

Architect

AHMM

Main Contractor

Galliford Try Construction

Client

Bell Hammer

PCE Ltd was pleased to have been awarded a contract by Galliford Try to design, manufacture, and construct a HybriDfMA office building frame using offsite manufactured structural steel and precast concrete components together with insitu reinforced concrete.

Building C of the central Bristol Assembly development is a 14-storey tower adjacent to the River Avon for property developer Bell Hammer working with insurer, AXA. The architect was AHMM, with consulting engineers ARUP.

The HybriDfMA framed building provides 92,000 sq.ft. of office space utilising PCE’s experience of Modern Methods of Construction (MMC), offsite engineering and providing as much offsite construction as possible in a very busy city centre location.

Safety

Quality

Speed

Value

PCE System Used

Hybrid Frames

Systemised DfMA delivery of hybrid structural frames and façades

Know More

Related System Projects

Assembly Building B

View More Projects

Let's Talk...

If you would like to discuss a project please contact our team to discuss your requirements...

What's New?

Wates' Offsite Partner Award...

View Article

Structural Completion: 3 Copper Square – A Landmark in...

View Article

From Japan to the UK: TODA Explores PCE’s Systemised...

View Article
Let's Talk