PCE Ltd was pleased to have been awarded a contract by Galliford Try to design, manufacture, and construct a HybriDfMA office building frame using Offsite manufactured structural steel and precast concrete components together with insitu reinforced concrete.
Building C of the central Bristol Assembly development is a 14-storey tower adjacent to the River Avon for property developer Bell Hammer working with insurer, AXA. The architect is AHMM, with consulting engineers ARUP.
The HybriDfMA framed building will provide 92,000 sq.ft. of office space utilising PCE’s experience of Modern Methods of Construction (MMC), Offsite engineering and providing as much Offsite construction as possible in a very busy city centre location.