Recently completed Hybrid Construction projects by PCE

PCE Ltd is the market leader in the design and build of Hybrid offsite engineered structures principally using precast concrete, insitu concrete, and structural steelwork.

It has extensive experience within many construction sectors including custodial, commercial, residential and infrastructure and has an innovative approach to construction methods with the emphasis on efficiency and value engineering.

2021-09-06T11:21:40+01:00

1,805 Precast Concrete Components for 101 dwelling apartment block

Vulcan Mill, Manchester Safety Safety considerations highly prioritised at digital design stage and carefully followed through project manufacturing and assembly stages. Quality PCE’s Quality Standards implemented through design, manufacture and on-site assembly ensured accurate and rapid build process. Speed 1,805 HybriDfMA components ...read more »

2020-12-01T15:36:36+00:00

Four storey lift and stair cores

Project Sienna, Basingstoke Safety Constructed during the initial Covid -19 lockdown with full implementation, and surpassing, all necessary appropriate safe working guidelines. Quality Components erected into the structures on a first-time fit basis due to the high offsite quality control by PCE during manufacture. ...read more »

2018-11-15T13:51:51+00:00

Paradise redevelopment project, Birmingham

Paradise, Birmingham City Centre Scale Over 2500 precast concrete and structural steel components used to form the two-storey Hybrid structure. Flexibility Hybrid design solution enabled flat obstruction free soffits reducing M&E costs and programme. Quality Offsite quality-controlled manufacture ensured the fit of ...read more »

2018-10-24T11:36:09+01:00

University of Lincoln student accommodation

Student accommodation at the University of Lincoln Scale 2,700 precast components forming three blocks of student accommodation, up to 11 storeys high. Flexibility Tight site boundaries and a single lane access road required thorough logistic planning and coordination to meet programme and allowance for other ...read more »