Project Description
Award winning VW dealership, Brentford
Scale
- 15468m² of suspended floor are forming a four storey structure
- Showroom, service, stores and showroom
- 300m² of multi storey car parking.
Flexibility
- PCE GT long span precast concrete floor units used for car park decks
- Hollowcore flooring units used in showroom office areas supported by steel Delta Beams to give a flush soffit.
Mixed use precast concrete frame for 15,468m² structure
The 15,468m2 structure forms the new flagship Volkswagen sales and service centre in the UK. It is a suspended four-storey facility with a service centre at ground floor, showroom at first and second floors, offices, as well as 7300m² of car parking over four suspended levels.
The project was constructed within an 18 week on-site programme, giving a 14 week saving over an in-situ concrete solution. The structure was erected using an LR1130 and an LR1160 crawler crane, part of the crane fleet owned by PCE Ltd.
3D modelling
The use of 3D modelling during the design process assisted in ensuring that the potential clash of structure with M&E services was avoided, as well as helping to determine the accuracy of connections and developing logistics and erection programmes.
Off-site precast concrete
Over 1500 precast concrete components, some weighing in excess of 20 tonnes, were manufactured in six different off-site precast concrete factories. Just-in-time delivery was co-ordinated to ensure a fast on-site construction programme was maintained.
Off-site construction of concrete frames is not new to PCE. The company has developed control systems to ensure that the functionality of its design processes flows through component manufacturing to ensure optimum on-site construction, with the safety of all personnel being of paramount importance.
Quality of finish
Most of the elevated showroom and car service areas do not have exposed concrete finishes, thus hollowcore flooring units were used with an in-situ structural concrete topping, supported by a precast frame (including Deltabeams) to ensure minimal downstands.
This ensured the ease of running M&E services and maximised ceiling-to-floor heights.
To ensure visual attractiveness, the architect also specified circular columns cast in white concrete in the car showroom areas; these were easily accommodated within the design-and-build process.
Further information
Location: Brentford, west London, UK
Client: Volkswagen
Architects: Bond Bryan
Structural stability
The three stair and lift shafts that provide structural stability to the finished structure used a precast concrete box solution, rather than individual panels, enabling full height construction of these shafts including stairs and landings to be achieved in less than eight days.
“This project is an example of what can be achieved using off-site concrete construction techniques together with BIM and experienced trained personnel.”
Nickie Brown, Managing Director of PCE Ltd.