Emirates Old Trafford Hotel

//Emirates Old Trafford Hotel
Emirates Old Trafford Hotel 2018-04-06T12:53:18+00:00

Emirates Old Trafford updates

PCE Ltd have been appointed by Galliford Try Construction to design and build a structural hybrid frame for a seven storey hotel for Hilton Garden Inns at the Emirates Old Trafford ground in Manchester, home of Lancashire County Cricket Club.

  • Emirates Old Trafford Hilton Garden Inn constructed by PCE
  • Structural precast cores by PCE at Old Trafford Cricket Ground

Emirates Old Trafford update 10 – Hilton Garden Inn nearing completion

May 15th, 2017|Comments Off on Emirates Old Trafford update 10 – Hilton Garden Inn nearing completion

[vc_row][vc_column][vc_column_text] Precast concrete, structural steelwork and insitu concrete PCE Ltd have designed the Hilton Gardens Inn at Lancashire Cricket Club's Emirates Old Trafford Cricket Ground using precast concrete, structural steelwork and insitu concrete to ensure that all [...]

  • PCE are constructing a seven storey hotel for Hilton Garden Inns
  • The Hilton Gardens Inn will have two structural precast cores
  • During test matches hotel bedrooms will become private hospitality suites
  • PCE have designed the structure using precast concrete
  • Emirates Old Trafford precast concrete columns and beams

Emirates Old Trafford update 9 – Hilton Garden Inn takes shape

February 14th, 2017|Comments Off on Emirates Old Trafford update 9 – Hilton Garden Inn takes shape

The hotel has two structural precast cores The design and detailing of the offsite engineered structure was carried out by PCE Ltd's in-house design and detailing team, using 3D modelling and associated design software. The soon to [...]

  • Emirates Old Trafford Hotel precast concrete hybrid construction
  • Emirates Old Trafford Hotel hybrid offsite construction
  • Emirates Old Trafford Hotel precast concrete construction

Emirates Old Trafford update 8 – ready for the top floor

December 1st, 2016|Comments Off on Emirates Old Trafford update 8 – ready for the top floor

Offsite precast construction benefits shown at test match ground Once completed, the hotel bedrooms at the Hilton Garden Inns at the Emirates Old Trafford cricket ground in Manchester will become private hospitality suites during international test matches. The structure is [...]

  • Precast concrete units for first floor of Old Trafford Hilton
  • PCE Ltd installing offsite constructed precast concrete slabs
  • Precast concrete balcony slabs at Old Trafford Cricket Ground
  • PCE Ltd installing offsite constructed precast concrete slabs
  • Cantilever balcony being installed
  • Emirates Old Trafford precast concrete construction
  • Offsite manufactured concrete installation at Old Trafford
  • Emirates Old Trafford ground in Manchester features PCE's hybrid construction methods

Emirates Old Trafford update 7 – construction of 1st floor of hotel

August 10th, 2016|Comments Off on Emirates Old Trafford update 7 – construction of 1st floor of hotel

Precast concrete units for Hilton Gardens Inn Update: last level one balcony slab being installed. The first floor walls are now arriving onsite and are being installed. PCE Ltd's hybrid offsite construction methods are once again being [...]

  • The design and detailing of the offsite engineered structure is being carried out by PCE
  • Emirates Old Trafford precast conscrete construction by PCE Ltd
  • PCE have designed the structure using precast concrete, structural steelwork and insitu concrete
  • PCE Ltd have been appointed by Galliford Try Construction

Emirates Old Trafford update 6 – podium level complete

July 28th, 2016|Comments Off on Emirates Old Trafford update 6 – podium level complete

Precast structure now being concreted over Photographs of the latest phase of the development of the seven storey hotel for Hilton Garden Inns at the Emirates Old Trafford ground in Manchester, shows the complete podium structure which is now being concreted. The [...]

  • PreFastCore prefast concrete units
  • Offsite constructed precast units by PCE Ltd

Emirates Old Trafford update 5 – first PreFastCore boxes installed

June 23rd, 2016|Comments Off on Emirates Old Trafford update 5 – first PreFastCore boxes installed

Offsite manufactured precast concrete elements arrive onsite The first PreFastCore units by PCE Ltd have arrived onsite at the Emirates Old Trafford Cricket Ground - and are rapidly being installed. Rapid on site erection to [...]

  • Old Trafford offsite precast construction

Emirates Old Trafford update 4 – columns with no propping

June 16th, 2016|Comments Off on Emirates Old Trafford update 4 – columns with no propping

Day one on site as first columns go up Construction of a new hotel at the Old Trafford Cricket ground has begun, with an impressive start - 12 precast column have been installed on the [...]

  • PreFastCore offsite precast construction

Emirates Old Trafford update 3 – PreFastCore in action

June 1st, 2016|Comments Off on Emirates Old Trafford update 3 – PreFastCore in action

First PreFastCore elements completed offsite The first PreFastCore units have now been manufactured for the seven storey hotel for Hilton Garden Inns at the Emirates Old Trafford ground in Manchester. They will form part of the structural core of this exciting development [...]

  • Project Director Chris McReynolds with the PCE Ltd Design Team

Emirates Old Trafford update 2 – 3D modelling

May 27th, 2016|Comments Off on Emirates Old Trafford update 2 – 3D modelling

PCE’s design team part of BIM system approach The Emirates Old Trafford Hotel project is a major step forward in the continuing growth of PCE Ltd. All structural engineering design and detailing for the project is [...]

  • Precast concrete columns, beams, hollowcore flooring
  • The hotel will have two structural precast cores
  • PCE have designed the structure using precast concrete, structural steelwork and insitu concrete
  • Emirates Old Trafford features a structural hybrid frame
  • PCE Ltd have been appointed by Galliford Try Construction to build the Lancashire CCC hotel

Emirates Old Trafford update 1 – project underway

May 10th, 2016|Comments Off on Emirates Old Trafford update 1 – project underway

Emirates Old Trafford will feature structural hybrid frame PCE Ltd have been appointed by Galliford Try Construction to design and build a structural hybrid frame for a seven storey hotel for Hilton Garden Inns at [...]