Student accommodation

//Student accommodation

PCE’s HybriDfma solution for Durham University underway

Design and procurement of the offsite manufactured components has started Interserve Construction Ltd has appointed PCE Ltd to provide structural solutions on a design and build basis using an offsite manufactured crosswall construction and architectural cladding approach for [...]

PCE’s HybriDfma solution for Durham University underway 2018-08-21T13:55:05+00:00

Offsite techniques enable construction when space is at a premium

Three blocks of precast student accommodation The site of the most recent student accommodation project in Lincoln would present a real challenge with more "traditional" construction methods. The site is a particularly tight one, being bordered on two [...]

Offsite techniques enable construction when space is at a premium 2018-07-18T13:53:24+00:00

Precast concrete construction at University of Lincoln

Three blocks of precast student accommodation PCE Ltd is currently onsite at the University of Lincoln, working with F P McCann Ltd on a construction only contract. F P McCann were awarded the design and build project for three blocks [...]

Precast concrete construction at University of Lincoln 2018-07-18T13:52:28+00:00

Portswood Road, Southampton update 2 – 2,990 precast concrete elements

Student accommodation takes shape Sladen Estates and Peveril Securities have joined forces to develop the former B&Q site appointing Church Lukas as Architects and Bowmer and Kirkland as Main Contractor who in turn appointed F P McCann as their precast [...]

Portswood Road, Southampton update 2 – 2,990 precast concrete elements 2018-04-03T16:10:12+00:00

Birmingham East Side update 3 – high speed offsite construction

Precast concrete solution for student accommodation The Birmingham East Side Locks high rise student accommodation project is progressing at an impressive pace by utilising the offsite engineering solutions that have been constructed by PCE Ltd. East Side update 2 [...]

Birmingham East Side update 3 – high speed offsite construction 2018-07-18T14:27:06+00:00

East Side update 2 – student accommodation precast construction

Birmingham precast construction project progresses The Birmingham East Side Locks development is the latest in a line of student accommodation projects carried out by PCE Ltd.  On-site construction is carried out by PCE to the highest quality that can [...]

East Side update 2 – student accommodation precast construction 2018-07-18T14:27:50+00:00

Precast student accommodation in Swansea

Precast concrete crosswall room solution This project is being undertaken by utilising F P McCann’s precast concrete crosswall room solution, constructed using solid precast walls and flooring units with some structural steelwork, insitu concrete and grouting to connect the [...]

Precast student accommodation in Swansea 2018-04-03T14:17:09+00:00