New project update – University of Leeds, Sir William Henry Bragg Building

Sir William Henry Bragg Building, University of Leeds A new £96m development, the Sir William Henry Bragg Building, will be constructed to create an integrated campus for Engineering and Physical Sciences at Leeds University for Leeds University Campus [...]

New project update – University of Leeds, Sir William Henry Bragg Building 2018-10-22T10:37:10+00:00

Chapel Wharf update 14 – first two towers structurally topped out

The precast concrete crosswall structural approach The first two apartment blocks have been structurally completed within the agreed construction programme as a result of PCE’s Offsite Engineered predominately precast concrete crosswall structural approach used on the nine hundred [...]

Chapel Wharf update 14 – first two towers structurally topped out 2018-10-17T12:41:19+00:00

Chapel Wharf update 13 – the top 5 offsite construction advantages

Crosswall construction with precast concrete Construction work by PCE Ltd is progressing at an impressive pace on the site of developer Dandara's nine hundred and ninety five build-to-rent apartment scheme at Chapel Wharf in Salford. PCE worked with [...]

Chapel Wharf update 13 – the top 5 offsite construction advantages 2018-08-30T10:28:20+00:00

Kingston University update 12 – external escape stair assembly

... and how temporary propping collars are being successfully utilised Rapid progress is being made with the  architectural colonnade structure on the site of the Kingston University Town House project near London. PCE Ltd worked with Willmott Dixon during the [...]

Kingston University update 12 – external escape stair assembly 2018-09-28T09:21:23+00:00

Kingston University update 11 – construction of the colonnade underway

Offsite fabricated hybrid solution for the concrete frame Kingston University appointed RIBA award winning Grafton Architects for their new landmark teaching building for their Penrhyn Road campus in Kingston Upon Thames. The six storey building will be the [...]

Kingston University update 11 – construction of the colonnade underway 2018-07-13T15:58:12+00:00

Chapel Wharf update 8 – 2,900 offsite precast units in 34 weeks

How offsite manufacture keeps onsite construction moving The on site construction of Chapel Wharf, a residential project in Salford, Manchester for developer Dandara, is making considerable and rapid progress. PCE Ltd has been engaged as the specialist design and build [...]

Chapel Wharf update 8 – 2,900 offsite precast units in 34 weeks 2018-07-13T16:34:45+00:00

“Winner of winners” recognition for PCE’s offsite engineered laboratory project

Offsite engineered concrete construction methods successfully address "significant" site challenges PCE Ltd was recently acclaimed as recipients of the Offsite Construction Awards Winner of winners award - beating over 200 other "pioneering projects" and "innovative products", according to a recent report [...]

“Winner of winners” recognition for PCE’s offsite engineered laboratory project 2018-04-30T14:02:07+00:00