How the “kit of parts” offsite engineering approach provides structural solutions for smaller buildings
Advantages of HybriDfMA construction for smaller sized buildings is beyond doubt A recent article in Concrete Magazine ...read more »
Advantages of HybriDfMA construction for smaller sized buildings is beyond doubt A recent article in Concrete Magazine ...read more »
Concrete Magazine highlights resulting reduction of overall floor depth and structural dead load The use ...read more »
Programme savings and reduced floor thicknesses result The lift and stair cores are of CEF's new ...read more »
"No need to improvise" with site safety considerations Construction of CEF's new data, IT and marketing ...read more »
Project nearing completion on time to programme Precast concrete units that have been installed at the Lexicon, Bracknell required no ...read more »
Ramps installed onsite as project nears completion The 1,300 space multi-storey car park in Bracknell ...read more »
1,300 space multi-storey car park construction showcases the precast approach The advantages of PCE Ltd’s offsite ...read more »
Cranes permanently on site during build Rapid progress at the Lexicon Bracknell is being made during the ...read more »
PCE design and build package demonstrates offsite benefits Once completed, the Lexicon Bracknell - the new name ...read more »
The benefits of offsite hybrid construction PCE Ltd worked in co-operation with main contractor MACE to ...read more »