Dakota Hotel update 9 – level completed in only 2 weeks!

Level three of Manchester hotel complete

PCE Ltd is currently installing the offsite engineered flooring units for level four of the forthcoming luxury five star Dakota Boutique Hotel project in Manchester.

The structural elements of level three have now been completed, allowing the work on the architectural and glazed units of the façade to be finished.

The latest level was completed - enabling internal fit out to take place - in only two weeks.

 

PCE is responsible for the design and build of the superstructure using their well proven offsite engineering Hybrid approach, with the structural stability to both the lower steel frame and upper concrete construction being provided by the stair and lift shaft cores being constructed using PCE’s PreFastCore system. The Manchester Dakota Hotel development forms part of the Evans Property Group strategic plan to bring its Luxury Dakota brand hotels to all key UK regional cities in the next five years.