Precast concrete hotel construction by PCE Hybrid

Hotel Construction

Complete multi-storey structural frame solutions for hotel projects, utilising the latest technology in design and offsite manufacture.

On-site construction is carried out by PCE Ltd to the highest quality that can be achieved, together with savings in programme periods and enhanced environmental benefits – whist at all stages of the project ensuring that Health and Safety is of paramount importance.

The Hybrid Structure method enables hotel schemes to be constructed from low rise up to 25 storeys with individual room or open floor plans as required. Transfer deck structures are frequently found at first floor level.

All required M&E services can be cast into the factory manufactured precast wall and floor components ensuring a high degree of accuracy.

This in turn will produce considerable practical, cost and time-related benefits, as well as reducing the time and number of other trade operatives required on-site to complete the project.

Pre-finished bathroom pods can be easily included.

Involving PCE Ltd in the early stages will maximise the benefit that they can bring to any such project.

Expertise with combining precast concrete, insitu concrete and structural steelwork will provide significant financial and efficiency benefits for the client.

Hotels portfolio ⬇︎

Telephone 01827 301020